Ouled Djellal marks Revolution anniversary with major development projects

To commemorate the 72nd anniversary of the start of the Revolution, Ouled Djellal's Wali, Abderrahmane Dehimi, oversaw the launch and inauguration of various infrastructure projects. In Ras El Miaâd, construction began on a vocational training center (550 million dinars), and a local swimming pool named after martyr Sahbi-Aissa was inaugurated (139 million dinars). During his visit, the Wali inspected a bridge project on National Road 60-B, which is over 90% complete, aimed at improving traffic safety. Agricultural developments include the opening of a 25 km road in Sekab and the start of a deep water well project in Nafida costing over 537 million dinars. Furthermore, a new high school project was launched in Sidi Khaled with an investment of 644 million dinars. The initiative aims to enhance basic services for the local population, and the visit included honoring two local moudjahidine.
